Pressing plant Mercedes-Benz
Daimler AG is expanding its existing press shop, Building 5, to build a 40m axle to create a new press. West of the building 5 is still a 1-storey logistics hall arise. The 2-storey building is divided into the following functional areas:
– Ground floor: material supply, scrap disposal
– First floor: production
– Technical floor: roof central
– Basement: channels for scrap disposal, escape tunnel
Details arrow_drop_down |